I am working on several things at once, as usual.
I am working through the cable pattern on glove #2 for me.
I am working on the back of the sweater for Mom - one complete set of rows and repeats, beginning second set. It measures about 2 inches, so it looks like 6.5 sets before I start the arm hole decreases.
I am working on socks for me. I have four pair. All misfitting. I am trying a size US1 for the newest pair and think (hope? pray?) that will take care of the "too bigness" on the feet of the last pair I made, which came the closest to fitting right.
I am working on put-together afghans for HAP (see sidebar for what HAP is!). I have finished 2 of 5, except for the weaving in of ends. I hope to weave in tomorrow and get these two to Deborah. Then work on the other three over my four day weekend! :)
I will be blocking my sister's Guinevere stole tomorrow at lunch, and at the end of the work day - hoping it will dry by Thursday morning so I can take it to show and tell at my knitting groups (lunch group at work; evening group at The Yarn Garden).
Pictures in a day or two of whatever is finished when I have good light. :)
Thanks for dropping by!
1 comment:
I can't wait to see the Guinevere Stole photos!! Congratulations on it's completion!
Post a Comment